Microsoft Project
io.github.HorizunGroup/horizun-msproject-mcp
About Microsoft Project
Microsoft Project is an MCP server published by the GitHub account HorizunGroup. Audit, reschedule and author Microsoft Project schedules. No Java, no Project install.
It runs on your own machine: your AI client starts it from the NuGet package HorizunMsProjectMcp at version 1.6.1.
It asks for no keys or passwords.
Version 1.6.1 was published on 20 October 2026, and the source code is public, so you can read it before installing.
Written from the registry entry. 7 automated checks on registry metadata: 4 pass, 0 warn, 0 fail, 3 info. How we check.
What it asks for
This server declares no environment variables, so it asks for no keys or settings.
Checks
| Check | Result | Detail |
|---|---|---|
| Source repository linked | Pass | https://github.com/HorizunGroup/horizun-msproject-mcp |
| Version pinned | Pass | Every package has an explicit version |
| Secrets requested | Info | Asks for no secrets |
| Known package registry | Pass | All packages come from npm, PyPI, OCI, NuGet or MCPB |
| Namespace ownership | Info | Name verified via GitHub account HorizunGroup |
| Registry text aimed at the AI | Pass | Description and settings contain no hidden characters or instructions to the AI |
| Code red flags | Info | nuget packages are not read yet |
Popularity & health: 52 / 100
Worked out from public numbers and our own checks, not from user reviews or ratings. It says how used and how looked-after a server is, not whether it is safe.
1 forks, 5 merged pull requests. Sources: GitHub, npm, PyPI (pypistats.org) and Hacker News (Algolia), fetched 2026-10-31.
What people say
No Hacker News threads link to its source code.
Look further: search Reddit, search Hacker News, read its GitHub issues. These are not reviews we checked.
Facts
| Registry name | io.github.HorizunGroup/horizun-msproject-mcp |
|---|---|
| Publisher | GitHub account HorizunGroup |
| How the name is verified | Name verified via GitHub account HorizunGroup. The registry ties the name prefix to that account or domain; it does not check the code. |
| Type | Local: runs on your machine from a package |
| Packages | nuget HorizunMsProjectMcp 1.6.1 (stdio) |
| Version | 1.6.1 |
| Published | |
| Last updated | |
| Source repository | https://github.com/HorizunGroup/horizun-msproject-mcp |
| Website | https://github.com/HorizunGroup/horizun-msproject-mcp#readme |
| Category | Productivity & notes (assigned by keyword rule, not by hand) |
Related servers in Productivity & notes
- meetergo8/8Book and reschedule meetings, manage contacts, and set up…
- Astrocal8/8AI-native scheduling: check availability, book meetings, cancel and…
- memdocs7/7Git-native project memory for AI assistants with enterprise-grade…
- JProfiler7/7Java profiling with AI agent integration. Profile CPU, memory,…
- OpenHCS7/7Inspect, author, validate, and run high-content microscopy workflows.
- Calaf Seed Tools4/4Author and validate Calaf workspace seeds against the app's real…